RWE GENERATION UK PLC

43 unique locations 324 components Page 1 of 1
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
  • • Pembroke 11 - CCGT MSID: 7237
  • • Pembroke 21 - CCGT MSID: 7237
  • • Pembroke 31 - CCGT MSID: 7237
  • • ... and 2 more unique descriptions
Combined Cycle Gas Turbine (CCGT)
6183.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
  • • Staythorpe 1 - CCGT MSID: 7210 (2)
  • • Staythorpe 2 - CCGT MSID: 7210
  • • Staythorpe 3 - CCGT MSID: 7210
  • • ... and 1 more unique descriptions
Combined Cycle Gas Turbine (CCGT)
4893.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (24 components)
  • • Didcot B5 - CCGT MSID: 4055 (3)
  • • Didcot B6 - CCGT MSID: 4055 (2)
Combined Cycle Gas Turbine (CCGT)
4108.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
  • • Little Barford 1 CCGT MSID: 4052 (3)
  • • Little Barford 1 OCGT . fuel type is distillate MSID: 4052 (2)
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines Combined Cycle Gas Turbine (CCGT)
2060.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (5)

Combined Cycle Gas Turbine (CCGT)
1122.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (25 components)
  • • Cowes 1 - OCGT, fuel is distillate MSID: 4548 (3)
  • • Cowes 2 - OCGT, fuel is distillate MSID: 4548 (2)
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
396.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (48 components)
  • • Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: … (2)
  • • Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
  • • Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
  • • ... and 1 more unique descriptions
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
283.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
  • • Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174 (3)
  • • Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: … (2)
Combined Cycle Gas Turbine (CCGT)
136.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (9 components)
  • • One (1) Open Cycle Gas Turbine MSID: 7382 (4)
  • • One (1) Open Cycle Gas Turbine
Open Cycle Gas Turbine (OCGT)
81.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
Dolgarrog Power Station, Dolgarrog, Conwy, LL32 8QE (4 components)

Hydroelectric plant (2)

Hydro
57.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (1 components)

Modular reciprocating engines

Reciprocating engines
21.0 MW
Active - 2028-29 (T-4)
Garrogie Hydro, Nr Whitebridge, Inverness-shire, IV2 6UR (2 components)

Hydroelectric Plant (2)

Hydro
4.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Storage (Duration 2h)
3.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Braevallich Farm, Dalmally, Argyll, PA33 1BU (2 components)

Hydroelectric plant. (2)

Hydro
3.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (1 components)

Hydroelectric run of river generating plant

Hydro
2.7 MW
Active - 2028-29 (T-4)
Inverbain Hydro, Shieldaig, Strathcarron, Ross-Shire IV54 8XH (2 components)

Hydroelectric plant (2)

Hydro
1.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Auchtertyre Hydro, Tyndrum, Perthshire, FK20 8RX (2 components)

Hydroelectric plant. (2)

Hydro
1.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Garnedd Hydro, Dolwyddelan, Gwynedd, LL25 0JQ (2 components)

Hydroelectric plant (2)

Hydro
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (1 components)

CMU formed of multiple individual Reciprocating Engines

Reciprocating engines
Active - 2024-25 (T-1)
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (6 components)
  • • CMU will be formed of multiple individual reciprocating gas engines. (3)
  • • CMU will be formed of multiple individual gas reciprocating gas engines. (2)
Reciprocating engines
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 3 more)
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 components)

The CMU will be formed of multiple gas reciprocating engines.

Reciprocating engines
Inactive - 2022-23 (T-4)
Markinch Power Station Glenrothes KY7 6GU (1 components)

The CMU will be formed of multiple gas reciprocating engines.

Reciprocating engines
Inactive - 2022-23 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 components)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Open Cycle Gas Turbine (OCGT)
Inactive - 2022-23 (T-4)
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
  • • CMU will be formed of multiple individual gas reciprocating engine units
  • • One (1) Open Cycle Gas Turbine
OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (4 components)
  • • Hythe Power Station - Auxiliary load behind boundary meter (2)
  • • Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
  • • Three (3) Reciprocating Gas Engines
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (1 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive - 2020-21 (T-4)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (2 components)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station (2)

Combined Cycle Gas Turbine (CCGT)
Inactive - 2019-20 (T-1), 2018-19 (T-1)
Grimsby Power Station (formerly known as Grimsby CHP) Moody Lane Grimsby DN31 2SW (1 components)

CMU will be formed of multiple individual gas reciprocating engine units

OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2018-19 (T-1)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
  • • Aberthaw 7 OCGT fuel type distillate
  • • Aberthaw 8 Coal fired
  • • Aberthaw 8 OCGT fuel is distillate
  • • ... and 2 more unique descriptions
Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Active - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
CM23 (28 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down
DSR
Active - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1)
PL7 (12 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)

Aberthaw 7 Coal fired unit (5)

Coal Coal/biomass
Active - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
CR5 (10 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
Grimsby Power Station Moody Lane Grimsby DN31 2SW (9 components)

CMU will be formed of multiple individual gas reciprocating engine units (5)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
RG31 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (6 components)
  • • One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (3)
  • • One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Combined Cycle Gas Turbine (CCGT)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
ME2 (3 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down
DSR
Active - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1)
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 components)

CMU will be formed of multiple individual gas reciprocating engine units

OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2021-22 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (5 components)
  • • Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter (2)
  • • CMU will be formed of multiple individual gas reiprocating engine units
Inactive - 2020-21 (T-4), 2017-18 (T-1)
Showing locations 1 - 43 of 43