PULSE CLEAN ENERGY UK LIMITED

18 unique locations 42 components Page 1 of 1
Hirwaun Industrial Estate, Main Avenue, Aberdare, Mid Glamorgan, CF44 9UY (1 components)

2-hour BESS storage asset

Storage (Duration 2.5h)
6.8 MW
Active - 2025-26 (T-1)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Storage (Duration 1h)
1.9 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

Storage (Duration 1h)
1.8 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

Storage (Duration 1h)
1.4 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Storage (Duration 1h)
1.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration battery storage project.
Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
  • • New build one-hour duration storage to replace diesel plant
  • • One Hour Duration Battery Storage Plant
Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1)
West Thorpe, Willoughby on the Wolds, LE12 6TD (6 components)
  • • Reciprocating engines (3)
  • • Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has … (2)
Inactive - 2020-21 (T-4), 2017-18 (T-1), 2016-17 (TR)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 components)

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h)
Inactive - 2023-24 (T-1)
Tir John North Road, St Thomas, SA1 8NS (1 components)

Gas fired reciprocating engines.

Reciprocating engines
Active - 2024-25 (T-4)
Main Ave, Hirwaun, CF44 9UY (7 components)
  • • Reciprocating engines (3)
  • • Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power … (2)
Inactive - 2020-21 (T-4), 2017-18 (T-1), 2016-17 (TR)
Pengarnddu Ind Est, Dowlais Top CF48 2TA (3 components)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Brunel Way, Briton Ferry, SA11 2GA (9 components)
  • • Gas fired reciprocating engines. (3)
  • • Reciprocating engines (2)
Reciprocating engines
Active - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 4 more)
Faraday Road, Plymouth, PL4 0ST (7 components)
  • • Reciprocating Engines (3)
  • • Gas fired reciprocating engines. (2)
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Active - 2024-25 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration Battery Storage Plant.
Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)