Search Map View Statistics Support Us Help Login Register

Plutus Energy LTD

64 unique locations 279 components Page 1 of 2
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Drax Power Station Drax Selby YO8 8PH (8 components)
  • • Unit 1 fuelled by Biomass at Drax Power Station (2)
  • • Unit 2 fuelled by Biomass at Drax Power Station
  • • Unit 3 fuelled by Biomass at Drax Power Station
  • • ... and 1 more unique descriptions
Biomass
2238.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
  • • A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5. (8)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (7)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC. (5)
  • • ... and 8 more unique descriptions
Coal Coal/biomass Open Cycle Gas Turbine (OCGT)
268.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 12 more)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h)
107.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
  • • Battery energy storage unit (2)
  • • Battery storage unit (2)
Storage (Duration 2h)
29.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Selby, North Yorkshire, YO8 6PG (2 components)
  • • A 40MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h)
25.1 MW
Active - 2028-29 (T-4)
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 components)

New Build Battery Storage Facility

Storage (Duration 4h)
16.7 MW
Active - 2028-29 (T-4)
Denison road, Selby, North Yorkshire, YO8 8AN. (8 components)

Gas Turbine Cogeneration Unit GT3 (5)

Combined Heat and Power (CHP)
14.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

CHP and autogeneration Combined Heat and Power (CHP)
7.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Bay Street Thorpe Willoughby SELBY North Yorkshire YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
CHERRY TREE WALK BARLBY SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
COMMON ROAD SKIPWITH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
DYON WAY BUBWITH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
FARRIER CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
FOXGLOVE WAY HAMBLETON SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HIGHFIELD CRESCENT BARLBY SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HILLAM ROAD GATEFORTH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HOLME CLOSE SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HOWARD CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
LEEDS ROAD SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
LODGE DYON LANE SOUTH DUFFIELD SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
LODGE DYON LANE, SOUTH DUFFIELD, SELBY, YO8 (4 components)

EV charging on residential premises (4)

DSR
Active - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Mayfield Drive Brayton Selby YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
MEADOW VIEW THORGANBY SELBY YO19 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
OAK FIELD BRAYTON SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
OAKLANDS CAMBLESFORTH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
OUSEGATE SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
RICHARDSON COURT HAMBLETON SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SELBY GROVE SHENLEY CHURCH END MILTON KEYNES MK5 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SELBY LANE KEYWORTH NOTTINGHAM NG12 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Sherwood Drive Thorpe Willoughby Selby North Yorkshire YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Spring Walk Selby North Yorkshire YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
VIEW NORTH DUFFIELD SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATERSIDE HEMINGBROUGH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Westbourne Road Selby YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Westcroft Lane Hambleton Selby YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WEST PARK SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WHITE GARTH BUBWITH SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WOOD CLOSE THORPE WILLOUGHBY SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WOOD LANE THORPE WILLOUGHBY SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
York Road Cliffe Selby YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
YORK ROAD NORTH DUFFIELD SELBY YO8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

DSR
Active - 2026-27 (T-4), 2023-24 (T-1)
Bridle Walk, Selby, North Yorkshire, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (2 components)
  • • Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 110 …
  • • Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive - 2020-21 (T-4)
Gascoigne Wood Mine Lennerton lane Sherburn in Elmet Selby LS25 6LH (1 components)

Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW

Inactive - 2020-21 (T-4)
Hales Lane Drax Selby YO8 8PL (1 components)

A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane

Storage (Duration 1h)
Active - 2025-26 (T-4)
Hobby Way, Selby, North Yorkshire, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Main Road, North Yorkshire, Selby, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Showing locations 1 - 50 of 64