Home List View Map View Technologies Companies Support Us Help Login Register
Theme

PIVOTED POWER LLP

3 unique locations 5 components Page 1 of 1
Map View
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Inactive - 2023-24 (T-1)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Inactive - 2023-24 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Showing locations 1 - 3 of 3