PIVOTED POWER LLP

7 unique locations 21 components Page 1 of 1
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h)
16.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
15.2 MW
Active - 2027-28 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
6.5 MW
Active - 2027-28 (T-4)
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
5.7 MW
Active - 2027-28 (T-4)
Showing locations 1 - 7 of 7