Search Map View Statistics Support Us Help Login Register

PIVOTED POWER LLP

4 unique locations 8 components Page 1 of 1
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 4h)
23.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h)
19.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 3.5h)
15.5 MW
Active - 2025-26 (T-1)
Showing locations 1 - 4 of 4