Search Map View Statistics Support Us Help Login Register

PIVOTED POWER LLP

2 unique locations 8 components Page 1 of 1
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Showing locations 1 - 2 of 2