-
• 8.300MW Gas Turbine installation
(3)
-
• 8.3MW Gas Turbine installation
(2)
7.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 0.15MW of demand reduction
(3)
-
• 10 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
-
• 1MW of demand reduction
(2)
-
• 1 MW of demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
0.261MW Storage Battery located in Devon
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
A 0.5MW Lithium Ion Battery based in Nottingham
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.8MW demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
40MW of Demand Reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.1MW Tesla battery located at Eversham
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.85 MW CHP Located at Poole Hospital
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
3MW Battery Storage facility located at Scarborough
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
14.700MW CHP located at Cowie, Stirling.
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
-
• 6 MW Battery Storage facility located at Westoning.
(2)
-
• 6MW of demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
-
• 3.348 MW gas engine CHP plant
(2)
-
• 1 x 3.3 MW gas engine CHP plant
Inactive -
2021-22 (T-4),
2018-19 (T-1),
2017-18 (T-1)
7.5MW Lithium Ion Battery Technology
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
A 0.18 MW Storage facility located in Norwich
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
2MW CHP located at Salford
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
6 MW storage battery
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
1.14MW Battery Storage Facility
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
26MW of Turn Down Capability
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
-
• 1MW of demand reduction
(2)
-
• 1MW demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.2MW of turn-down
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
9.8MW of turn down
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
-
• 1MW demand reduction
(2)
-
• 1MW of demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
20 MW storage battery
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
3.75 MW storage battery located in Devon
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
10.754 MW CHP Plant with 2 new Gas Turbines
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.9MW Battery storage located at Hampshire
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.8MW demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
0.25MW of demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
1MW of demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
1.5MW battery located in Southampton
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
Generators on hospital site
(5)
Active -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Generators at hospital site
(5)
Active -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• Load drop
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• 5 MW of demand reduction
(3)
-
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Demand reduction
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)