-
• 0.261 MW of DSR
-
• 0.261 MW of demand reduction
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
Battery Energy Storage System
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
19 MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 1.800 MW CHP generation
(3)
-
• 1.8 MW CHP generation
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
4MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 0.6MW of turn down
(2)
-
• 4MW of DSR
(2)
-
• Turn down component
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 2MW of DSR
(3)
-
• 0.250 MW of demand reduction
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
0.27MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
4 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
2 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
1.6MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 5 MW of demand reduction
(3)
-
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• 0.15MW of demand reduction
(3)
-
• 10 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 2.6MW of demand reduction
(2)
-
• Turn down CMU
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2017-18 (TR)
03MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.8 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
2MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.45MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.3MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.194 MW CHP generation
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.2MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.29MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 0.4MW demand reduction
(2)
-
• Turn down of 11kv connection
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2017-18 (TR)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
2 MW demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
10 MW demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.18 MW of Demand Reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.36MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.4MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 1MW of demand reduction
(2)
-
• 1 MW of demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 1MW of demand reduction
(2)
-
• 1MW demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 1MW demand reduction
(2)
-
• 1MW of demand reduction
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 3 MW of DSR
-
• 3 MW of demand reduction
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
-
• 800kW/1100kWh Lithium Ion Battery
(3)
-
• 0.8 MW of demand reduction
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
-
• 1000kW/1200kWh Lithium Ion Battery
(2)
-
• 1 MW of demand reduction
-
• 1MW Lithium Ion Battery
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
-
• Back up generation
(2)
-
• Onsite generation
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
(and 1 more)
-
• 10 MW of demand reduction
-
• 9.6 MW storage battery unit
Inactive -
2019-20 (T-1),
2018-19 (T-1)
-
• 0.250MW Battery Energy Storage System
(3)
-
• 0.25MW of Demand Reduction
-
• 5MW of demand reduction
Active -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)
3.750 MW of demand reduction
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
-
• 3MW of DSR
(3)
-
• 0.1MW of demand reduction
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)