-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 5 more)
-
• Gas fired CHP Unit
(4)
-
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
(and 2 more)
TA3 6PH
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
SP4 7BE
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
DT4 9AX
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
DT2 8PE
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
DT5 1BA
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
BA4 4JA
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
DT4 0DX
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
DT6 4EP
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
BA2 9DX
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
SP5 3EU
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
TA6 3JS
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
TA9 3QG
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
TA4 2UN
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
TA3 7PE
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• CHP Unit
-
• Gas Fired CHP
Inactive -
2018-19 (T-1),
2017-18 (T-1)
Gas fired CHP
Inactive -
2017-18 (T-1)
Diesel Generation
Inactive -
2017-18 (T-1)
Diesel Generation
Inactive -
2017-18 (T-1)
Diesel Generation
Inactive -
2017-18 (T-1)
Gas Fired CHP
Inactive -
2017-18 (T-1)
Diesel
Inactive -
2017-18 (T-1)
Gas Fired CHP
Inactive -
2017-18 (T-1)
Gas Fired CHP
Inactive -
2017-18 (T-1)
Gas Fired CHP
Inactive -
2017-18 (T-1)
Gas fired CHP
Inactive -
2017-18 (T-1)
Diesel Generation
Inactive -
2017-18 (T-1)
Gas fired CHP Unit
Inactive -
2017-18 (T-1)
Diesel Generation
Inactive -
2017-18 (T-1)
Component has yet to be procured
(5)
Active -
2027-28 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)