-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas fired CHP unit
(5)
19.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
Gas fired CHP unit
(5)
5.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• CHP unit
(3)
-
• Gas CHP located in St. Austell
(2)
3.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Gas CHP
(3)
-
• Gas CHP in St. Austell
(2)
3.4 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(3)
-
• Gas CHP in St. Austell
(2)
3.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Onshore Wind Farm at Greengairs
(3)
2.5 MW
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-4)
CHP Unit
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
London School of Hygiene & Tropical Medicine - DSR
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Generator at the Hospital
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• CHP Unit
(3)
-
• Gas fired CHP unit
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Behind the Meter Generation
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
CHP
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 2 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Commercial printers
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Stockport DSR
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Paper mill industrial site
(5)
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 6 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
CHP
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 2 more)
CHP plant
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 5 more)
2MW BESS
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-1)
(and 2 more)
Battery Energy Storage System
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Gas fired CHP unit
(2)
Inactive -
2022-23 (T-1),
2021-22 (T-1)
CHP plant
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
CHP
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Gas fired CHP Unit
(4)
-
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
(and 2 more)
CHP Plant
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
TA3 6PH
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
SP4 7BE
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
2MW BESS
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
DT4 9AX
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Gas reciprocating engine
Inactive -
2021-22 (T-1)
8 Gas-fired CHP units
(2)
Inactive -
2021-22 (T-4),
2018-19 (T-1)
DT2 8PE
(4 components)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Gas Reciprocating engine
Inactive -
2021-22 (T-1)
Water treatment centre
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)