On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
(5)
122.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• existing on site CHP
(3)
-
• existing onsite CHP
(2)
46.2 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
-
• On-Site Generating CMU.
(2)
-
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
(2)
-
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity …
38.0 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
On-site Generating CMU.
(3)
28.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• existing CHP on site.
(3)
-
• existing on site CHP
(2)
28.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-site CHP - existing generating unit
(5)
19.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.
18.2 MW
Active -
2028-29 (T-4)
Existing Generation on existing site - CHP
(5)
18.2 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
Existing Generation on existing site - CHP
(5)
14.8 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
-
• energy from waste unit
-
• generating gas unit
9.9 MW
Active -
2027-28 (T-4)
Callington - Existing Site CHP unit
(5)
9.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-Site Generating CMU
(3)
8.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
8.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
(5)
8.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
On-Site Generating CMU
(3)
7.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-site Generating CMU.
(2)
5.6 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
On-Site Generating CMU
(3)
5.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
5.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Poole Existing Site CHP
(5)
4.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• On-site Generating Unit.
(2)
-
• on site generating cmu
(2)
4.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Hamms Hall - Existing Site CHP
(8)
4.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-Site Generating CMU
(3)
4.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Existing Generation on existing site - CHP
(5)
4.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Warrington Existing Site CHP
(5)
3.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-site Generating CMU.
(3)
3.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
3.2 MW
Active -
2028-29 (T-4)
-
• on site generating CMU
(2)
-
• On-site Generating CMU
3.2 MW
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
Existing Generation on existing site - CHP
(5)
2.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
-
• On-site Generating CMU
(2)
-
• on site generating CMU
(2)
2.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
On-Site Generating CMU
(3)
2.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
2.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Existing Generation on existing site - CHP
(5)
2.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
On-Site Generating CMU
(3)
2.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
New-Build Li-Ion BESS, 2hr duration.
2.1 MW
Active -
2028-29 (T-4)
On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
(5)
2.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
on site generating CMU
(3)
1.8 MW
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
On site generating CMU
(2)
1.8 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
new build on site generating CMU
1.4 MW
Active -
2027-28 (T-4)
On-Site Generating CMU
(2)
1.3 MW
Active -
2025-26 (T-1),
2024-25 (T-1)
New-Build CHP Generating Unit at Berry Wicks Farm.
1.3 MW
Active -
2028-29 (T-4)
new build on site generating CMU
0.9 MW
Active -
2027-28 (T-4)
-
• New-Build Li-Ion BESS, 2hr duration.
-
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
0.6 MW
Active -
2028-29 (T-4),
2024-25 (T-1)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(2)
Active -
2028-29 (T-4),
2025-26 (T-1)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(9)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(9)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)