GREEN FROG POWER LIMITED

4 unique locations 13 components Page 1 of 1
Ipswich Road, Cardiff, CF23 9AQ (10 components)
  • • New build two-hour duration battery storage (2)
  • • New build one-hour duration storage
Storage (Duration 1h) Storage (Duration 2h)
26.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
  • • New build one-hour duration storage
  • • New build two-hour duration battery storage
Storage (Duration 1h) Storage (Duration 2h)
6.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
Storage (Duration 1h) Storage (Duration 1.5h)
4.7 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
Storage (Duration 1h) Storage (Duration 1.5h)
4.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)