Search Map View Statistics Support Us Help Login Register

FPC ELECTRIC LAND LIMITED

25 unique locations 37 components Page 1 of 1
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
  • • Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h)
67.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
Storage (Duration 2h)
34.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
20.9 MW
Active - 2028-29 (T-4)
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
20.7 MW
Active - 2028-29 (T-4)
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 components)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h)
18.5 MW
Active - 2027-28 (T-4)
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 components)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h)
18.5 MW
Active - 2027-28 (T-4)
Land off Bilport Lane, Wednesbury, Ws10 0PD (1 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h)
17.7 MW
Active - 2026-27 (T-4)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
14.7 MW
Active - 2028-29 (T-4)
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (1 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Storage (Duration 2h)
14.7 MW
Active - 2028-29 (T-4)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h)
14.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
Storage (Duration 1h) Storage (Duration 2h)
10.8 MW
Active - 2027-28 (T-4), 2025-26 (T-4)
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
10.5 MW
Active - 2028-29 (T-4)
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h)
7.8 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

Storage (Duration 1.5h)
7.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land adjacent Mount Pleasant Farm, Green Lane, Barton, Preston, PR3 0RP (1 components)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h)
6.9 MW
Active - 2027-28 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
6.3 MW
Active - 2028-29 (T-4)
Land off Bilport Lane, Wednesbury, WS10 0PD (1 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h)
5.9 MW
Active - 2026-27 (T-4)
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
5.2 MW
Active - 2028-29 (T-4)
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
4.2 MW
Active - 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h)
3.1 MW
Active - 2028-29 (T-4)
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent

Storage (Duration 1h)
Active - 2025-26 (T-4)
Land Lying to the South of Diplocks Way, Hailsham, BN27 3YN (1 components)

4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hailsham

Reciprocating engines
Active - 2025-26 (T-4)
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 components)

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Reciprocating engines
Active - 2024-25 (T-4)
Showing locations 1 - 25 of 25