Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
(10)
72.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
(3)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
(2)
17.3 MW
Active -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• Gas engine
(3)
-
• Gas turbine
(2)
11.2 MW
Active -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 7 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
7.6 MW
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Gas-fired CHP unit
(5)
7.3 MW
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP unit
(5)
7.2 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
4.0 MW
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 3 more)
Standby generation
(5)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 4 more)
Component has yet to be procured.
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
Standby generation.
(5)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 4 more)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
(3)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
(2)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
gas-fired CHP unit
(5)
Active -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Active -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Standby generation
(5)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Active -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)