Ecotricity Generation Limited

7 unique locations 16 components Page 1 of 1
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Land to the west of West Ham Waterworks, Churchill Way W, Basingstoke RG21 6YR (2 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the distribution network … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Garstons Track, Winchester SO21 2BJ, UK (2 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (2 components)

This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (2 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Norrington Ln, Broughton Gifford, Melksham SN12 8LP (2 components)

This CMU is formed of a battery bank and PCS capable of providing 15MW of power. The system is connected via switch gear and a transformer to the distribution network … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Severn Way, Berkeley GL13 9TN (2 components)

This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network … (2)

Storage
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Showing locations 1 - 7 of 7