-
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
(4)
-
• Power Station for Paper plant made up of 1x35MW Gas engine
41.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• Gas Turbine CHP GT001B
(3)
-
• Steam Turbine CHP
(2)
15.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Gas Turbine Cogeneration Unit GT3
(5)
14.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(5)
7.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
CHP Engine 3.360MW
(5)
6.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
Gas Turbine CHP GT001A
(5)
5.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
2026 kW CHP unit
(5)
1.8 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
1 * 1.7MW diesel reciprocating engine
(5)
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
1.521 MW CHP unit
(5)
1.3 MW
Active -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
1.280MW CHP
(5)
1.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1280 KWe Combined Heat and Power unit.
(5)
1.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
EnerG 1000 CHP
(5)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
MTU - 8V400064 1.013MW
(5)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2022-23 (T-1)
(and 2 more)
EnerG 1000 CHP
(5)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
E1000 CHP
(5)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
E1000 CHP unit
(5)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
Battery Storage
(5)
0.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage
(5)
0.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
(2)
-
• Steam Turbine
(2)
-
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
(and 1 more)
-
• 0.8 MWe Gas Powered Generation Unit
-
• 0.8 MWe Gas powered generator
Inactive -
2019-20 (T-1),
2018-19 (T-1)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Office site with behind the meter generation
(3)
-
• Office site with behind the meter back up generation
-
• Office site with behind the meter generation.
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
(2)
-
• Gas Generation units at 1013kWe
-
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
-
• ... and 1 more unique descriptions
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 1 more)
Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …
(5)
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
Industrial Gases production site. DSR provided through process interruption.
(5)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Battery storage
(2)
-
• Battery strorage unit
(2)
-
• Battery Storage
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
CHP and autogeneration
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
1.9 MW Gas gen ENER-G 1999
(5)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 3 more)
Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
(4)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 1 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(2)
Active -
2026-27 (T-4),
2025-26 (T-4)
Distribution Centre with behind the meter back up generation
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)