Search Map View Statistics Support Us Help Login Register

CBS ENERGY STORAGE ASSETS UK LIMITED

9 unique locations 22 components Page 1 of 1
Greenfield site, Stainton, Rotherham, S66 7RQ (1 components)

Battery Storage 2 hour duration

Storage (Duration 2h)
18.9 MW
Active - 2026-27 (T-4)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF (2 components)

A 28MW new build of battery storage unit. (2)

Storage (Duration 2.5h)
16.8 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Newburth, Perth, Scotland, KY14 6EW (1 components)

Storage battery 2h duration

Storage (Duration 2h)
13.6 MW
Active - 2028-29 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h)
9.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Malton Road, Malton YO17 8JF (1 components)

A 40MW new build of battery storage unit.

Storage (Duration 2h)
6.2 MW
Active - 2027-28 (T-4)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (9 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station. (5)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 5 more)
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)
  • • A Prospective New Build Gas reciprocating energy reserve facility (4)
  • • Gas reciprocating energy reserve facility
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Active - 2024-25 (T-4), 2023-24 (T-4), 2020-21 (T-4) (and 2 more)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Showing locations 1 - 9 of 9