New Build Battery Storage
7.5 MW
Active -
2028-29 (T-4)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.
2.5 MW
Active -
2026-27 (T-4)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
2.2 MW
Active -
2026-27 (T-4)
EV charging at residential premises
Inactive -
2023-24 (T-1)
EV charging at residential premises
Inactive -
2023-24 (T-1)
This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.
Inactive -
2021-22 (T-4)
Energy facility comprising of reciprocating engine sets.
Inactive -
2021-22 (T-4)
-
• 2.115MW diesel reciprocating engine
(2)
-
• 2.115MW Diesel reciprocating engine
-
• 2.116MW Diesel reciprocating engine
-
• ... and 1 more unique descriptions
Inactive -
2018-19 (T-1),
2017-18 (T-1)
2.116MW diesel reciprocating engine
(2)
Inactive -
2018-19 (T-1),
2017-18 (T-1)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging on residential premises
(4)
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging on residential premises
(4)
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(2)
Active -
2026-27 (T-4),
2023-24 (T-1)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active -
2024-25 (T-4)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active -
2024-25 (T-4)
-
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
-
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active -
2025-26 (T-1),
2024-25 (T-1)
Commercial sites
Active -
2024-25 (T-1)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.
Active -
2025-26 (T-1)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.
Active -
2024-25 (T-1)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
Energy facility comprising of reciprocating engine sets.
Active -
2024-25 (T-4)
EV charging at residential premises
Inactive -
2023-24 (T-1)
EV charging at residential premises
Inactive -
2023-24 (T-1)