BESS Claredown Limited

2 unique locations 6 components Page 1 of 1
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 components)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (5 components)
  • • 20MW Battery Storage Facility located in Sudbury, Essex. (2)
  • • 20 MW of DSR
  • • 20 MW of demand reduction
DSR Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2020-21 (T-1) (and 2 more)