3 unique locations (6 components)

adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Land to Far Souracre, SK15 3DA (2 components)

Lithium ion battery storage plant

Active • 2028-29 (T-4)
31.40 MW
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW