Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Willington Power Limited

7 unique locations (34 components)

Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (5 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2023-24 (T-1) ...
5.79 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (8 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
UNITS A, B, C & D POSTLEY ROAD KEMPSTON BEDFORD MK42 7AG (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 7 locations