Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Waterswallows Energy Limited

112 unique locations (320 components) - Page 1 of 12

Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.27 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.63 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
NORTHUMBRIAN WATER, BLACKWELL PUMPING STATION, CROFT ROAD,DARLINGTON, DL2 2SD (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (6 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations