Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Waterswallows Energy Limited

6 unique locations (54 components)

Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
90.66 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.79 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
• A standby diesel generator on a waster water treatment works. (3)
• A standby diesel generator on a waste water treatment works. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Water Street , Chorley, PR7 1EX (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 6 locations