VIRIDOR ENERGY LIMITED

7 unique locations (30 components)

Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (10 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export … (3)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.81 MW
Exeter ERF, Grace Road South, Exeter EX2 8QE (11 components)
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and … (3)
• Energy from Waste Facility located in Grace Road, Exeter. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.14 MW
Beddington Farmlands Waste Management Facility, Beddington Lane, Croydon, Surrey, CR0 4TG (1 component)

Beddington ERF .- Energy Recovery Facility

Inactive • 2020-21 (T-4)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a … (3)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Grace Road South, Exeter, EX2 8QE (3 components)

Energy from Waste Facility which exports at between 3MW and 3.5MW subject to calorific value of waste and biogenic content. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (2 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ (3 components)

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point). (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 7 locations