Home List View Map View Technologies Companies Support Us Help Login Register
Theme

VEOLIA UK LIMITED

27 unique locations (166 components) - Page 1 of 3

Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (8 components)

Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
69.99 MW
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (8 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex (7)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.58 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.74 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.34 MW
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (9 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.74 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.55 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity … (2)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.39 MW
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (7 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (5)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Recycling Centre, Warren Way, Forest Town, Mansfield, NG19 0FL (7 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (5)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (7 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR. (5)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations