Home List View Map View Technologies Companies Support Us Help Login Register
Theme

SSE GENERATION LIMITED

12 unique locations (104 components) - Page 1 of 2

Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)
• Peterhead CCGT (9)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3242.27 MW
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (25 components)
• Generating Unit 1 (2)
• Generating Unit 2 (2)
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
228.42 MW
Clunie Power Station, Pitlochry, PH16 5NF (12 components)
• ROCable hydro units within the BMU are not included in the CMU. (8)
• Hydro Generating Gensets 1, 2 & 3 - Clunie (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
167.28 MW
Lochay Power Station, Killin, Stirling, FK21 8UA (22 components)
• Genset 1. ROCable hydro units within the BMU are not included in the CMU. (6)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU. (6)
• Genset 1. (2)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
147.02 MW
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (10 components)
• Gensets 1 & 2 (2)
• Livishie Hydro Generation Genset (2)
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
130.93 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (33 components)

1 x hydro turbine & synchronous generator (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
123.91 MW
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (8 components)

1 x hydro turbine & synchronous generator (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
111.88 MW
Deanie Power Station, Kiltarlity, Beauly, IV4 7JX (16 components)
• Deanie Unit 1 (3)
• Deanie Unit 2 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
103.87 MW
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (30 components)

1 x hydro turbine & synchronous generator (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.95 MW
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (8 components)
• ROCable hydro units within the BMU are not included in the CMU. (5)
• Hydro Generation Gensets 1 & 2 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
92.93 MW
Loading map...
Showing 10 locations