Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Plutus Energy LTD

42 unique locations (307 components) - Page 1 of 5

Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Drax Power Station Drax Selby YO8 8PH (8 components)
• Unit 1 fuelled by Biomass at Drax Power Station
• Unit 2 fuelled by Biomass at Drax Power Station
• Unit 3 fuelled by Biomass at Drax Power Station
Active • 2028-29 (T-4), 2027-28 (T-4)
2238.05 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
107.63 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
• Battery energy storage unit (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4)
29.76 MW
CHERRY TREE WALK BARLBY SELBY YO8 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
ANDREW CHAPEL COURT SELBY YO8 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
FIELD LANE WISTOW SELBY YO8 (8 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WOOD CLOSE THORPE WILLOUGHBY SELBY YO8 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
SELBY GROVE SHENLEY CHURCH END MILTON KEYNES MK5 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 10 locations