Home List View Map View Technologies Companies Support Us Help Login Register
Theme

PULSE CLEAN ENERGY UK LIMITED

18 unique locations (42 components) - Page 1 of 2

Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant (2)
• New build two-hour duration storage to replace diesel plant (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.32 MW
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.89 MW
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.77 MW
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.42 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration battery storage project.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
West Thorpe, Willoughby on the Wolds, LE12 6TD (6 components)
• Reciprocating engines (3)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has … (2)
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Loading map...
Showing 10 locations