18 unique locations (33 components) - Page 1 of 2

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
19.56 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
15.48 MW
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
15.16 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Loading map...
Showing 10 locations