PIVOTED POWER LLP

4 unique locations (13 components)

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Loading map...
Showing 4 locations