Home List View Map View Technologies Companies Support Us Help Login Register
Theme

OSSPV001 LIMITED

4 unique locations (14 components)

Tilbury Freeport Tilbury Essex RM18 7EH (2 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Port of Tilbury, Tilbury, RM18 7EH (2 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Tilbury Freeport Tilbury Essex RM18 7HE (9 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 4 locations