Limejump Virtual 1 Limited

20 unique locations (38 components)

Active MW: 5.83 MW
Inactive MW: 0.00 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (1 component)

5.2MW of batteries across several sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSR01 Rejected TS22
Inactive • 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (1 component)

5.2MW of batteries across several sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSR01 Rejected TS22
Inactive • 2021-22 (T-4)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (1 component)

9.8 MW Storage facility located at Swadlincote

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSR03 Rejected DE12
Inactive • 2018-19 (T-1)
Denmead Farm Edneys Lane Denmead Waterlooville PO8 0SJ (1 component)

24.95 MW of Battery Storage located at Waterlooville.

Storage Limejump Virtual 1 Limited New Build Generating CMU Lovedean 2 Rejected PO8
Inactive • 2021-22 (T-4)
Denmead Farm, Edneys Lane, Denmead, Waterlooville PO8 0SJ (1 component)

25 MW of Battery Storage located at Waterlooville.

Storage Limejump Virtual 1 Limited New Build Generating CMU Lovedean 1 Rejected PO8
Inactive • 2021-22 (T-4)
Hungerford Farm, Winchfield, Hook RG27 8SW (1 component)

5.4 MW of battery storage units across different sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSRA02 Rejected RG27
Inactive • 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (1 component)

5.4 MW of battery storage units across different sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSRA02 Rejected RG27
Inactive • 2021-22 (T-4)
Land at Manor Farm Wainfleet Road Irby in the Marsh Skegness Lincolnshire PE24 5AY (1 component)

9.408 MW of Battery Storage at Land at Manor Farm, Lincolnshire.

Storage Limejump Virtual 1 Limited New Build Generating CMU Manor Farm Rejected PE24
Inactive • 2021-22 (T-4)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (1 component)

15 MW Battery Storage facility located at Warwickshire.

Storage Limejump Virtual 1 Limited New Build Generating CMU Walworth Rejected CV47
Inactive • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Storage Limejump Virtual 1 Limited New Build Generating CMU Ilmer Rejected HP27
Inactive • 2021-22 (T-4)
Land North of Clayhill Farm Westoning MK45 5JD (2 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
DSR Storage LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU Banana Clayhill MK45
Inactive • 2021-22 (T-4)
Land North of Harriots Hayes Lane Albrighton Shropshire WV8 1RQ (1 component)

4.704 MW of Battery Storage located at Shropshire.

Storage Limejump Virtual 1 Limited New Build Generating CMU Albrighton 2 Rejected WV8
Inactive • 2021-22 (T-4)
Land West of Clay Hill Pit Larport farm Larport Lane Dormington Hereford HR1 4EP (1 component)

20 MW Battery Storage facility located at Hereford.

Storage Limejump Virtual 1 Limited New Build Generating CMU Larport Rejected HR1
Inactive • 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (9 components)
• Battery Storage located at Grantham. (2)
• 7 MW of Battery Storage located at Grantham.
Storage Storage (Duration 1h) ESB SOLAR (NORTHERN IRELAND) LIMITED Existing Generating CMU Mill Farm MillFarm1 +6 more NG32
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Needless Hall Farm Toronto Bishop Auckland DL14 7RJ (1 component)

21.6 MW of Battery Storage located in Bishop Auckland.

Storage Limejump Virtual 1 Limited New Build Generating CMU Needless Rejected DL14
Inactive • 2021-22 (T-4)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Storage Limejump Virtual 1 Limited New Build Generating CMU Partridge Rejected DN10
Inactive • 2021-22 (T-4)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Storage Limejump Virtual 1 Limited New Build Generating CMU Rock Farm Rejected SY8
Inactive • 2018-19 (T-1)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Storage Limejump Virtual 1 Limited New Build Generating CMU Rock Farm Rejected SY8
Inactive • 2021-22 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 20 locations