Home List View Map View Technologies Companies Support Us Help Login Register
Theme

E.ON UK Plc

28 unique locations (53 components) - Page 1 of 3

Huntsman Drive, Seal Sands, TS2 1TT (3 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
31.97 MW
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS (2 components)

Offshore wind farm

Active • 2028-29 (T-4)
11.58 MW
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Seal Sands, Middlesbrough, TS2 1UB (14 components)
• One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA (2)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (5)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (4 components)

Turbo Expander - for pressure reduction of incoming natural gas (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
Marston STW, MARSTON STW (LINCS), Track Off Sand Lane, Marston, GRANTHAM Lincolnshire, NG32 2HY, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Sand Street , Pwllheli, LL53 5RT (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 10 locations