Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CENTRICA BUSINESS SOLUTIONS (GENERATION) LIMITED

5 unique locations (26 components)

Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025kW gas engine (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.68 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025 KW gas fire engine (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.68 MW
Adlington Works, Market Street, Adlington, Lancashire, PR7 4HJ (2 components)

CHP with 1.280 rated capacity (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
2.28 MW
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (6 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 5 locations