Home List View Map View Technologies Companies Support Us Help Login Register
Theme

FLEXITRICITY LIMITED

775 unique locations 3752 components Page 1 of 16
Map View
Drakemyre, Dalry KA24 5JJ (18 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

CHP and autogeneration Combined Heat and Power (CHP)
26.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (27 components)
  • • One of three CHP in a horticultural environment (2)
  • • One of three CHP in a horticultural environment.
Combined Heat and Power (CHP)
13.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 2 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)

6 CHP engines horticultural environment with no auxiliiary load (3)

CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 2 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment
  • • One 1.5 MW gas CHP engine in a horticultural environment
  • • One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment.
  • • CHP at horticultural site
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (3)

CHP and autogeneration Combined Heat and Power (CHP)
8.7 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Combined Heat and Power (CHP)
8.4 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

CHP and autogeneration Combined Heat and Power (CHP)
6.4 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP)
6.0 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (3)

CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)

CHP engine in horticultural environment with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

CHP and autogeneration Combined Heat and Power (CHP)
5.6 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP)
5.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Combined Heat and Power (CHP)
5.5 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4)
School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

CHP and autogeneration Combined Heat and Power (CHP)
5.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (3)

Combined Heat and Power (CHP)
5.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP)
4.7 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (9 components)

CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered. (3)

CHP and autogeneration Combined Heat and Power (CHP)
4.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 2 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (4 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (2)

Combined Heat and Power (CHP)
3.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)

One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP)
3.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

CHP and autogeneration Combined Heat and Power (CHP)
3.5 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP)
3.0 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Combined Heat and Power (CHP)
2.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 2 more)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Ashgrove Road West, Aberdeen AB16 5UL (14 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Beach Esplanade, Aberdeen AB24 5NR (9 components)

District heating implementation with one asset 1MW and no auxiliary load (3)

Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Montgomery Road, Aberdeen AB24 2YA (14 components)

District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

CHP and autogeneration Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (2 components)

2 x CHP at a horticultural site (2)

Combined Heat and Power (CHP)
2.3 MW
Active - 2028-29 (T-4), 2024-25 (T-4)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (3 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export. (3)

Combined Heat and Power (CHP)
2.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP)
2.1 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW. (2)

Combined Heat and Power (CHP)
1.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (3 components)

One 2MW gas CHP engine in a horticultural environment (3)

Combined Heat and Power (CHP)
1.8 MW
Active - 2027-28 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

CHP and autogeneration Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
  • • Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP)
1.0 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Storage (Duration 1h)
1.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Utting Avenue , Liverpool, L4 9XU (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Radford Rd Hyson Green, Nottingham, NG7 5FP (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (4 components)

Mixture of load reduction and standby generation. (3)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Lancaster Road , Morecambe, LA4 5QW (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Brickhouse Lane South 0, Birmingham, DY4 7HW (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Narborough Road South , Leicester, LE3 2LL (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
North City Shopping Centre, Harpurhey, M9 4DJ (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Pedmore Road Brierley Hill West Midlands DY5 1LJ (8 components)

Load reduction (3)

DSR
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 2 more)
Bircotes Doncaster, Doncaster, DN11 8AB (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Currie Road , Galashiels, TD1 2AG (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Dabholm Rd, Middlesbrough, TS6 7RU (10 components)
  • • Load curtailment from refridgeration
  • • Load reduction from refrigeration
  • • Load reduction on site supported by non-exporting standby generation.
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Cowpen Road , Blyth, NE24 5TS (9 components)
  • • Load curtailment (2)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Joan Ln, Bamford, Hope Valley S33 6RB (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (3 components)

Standby generation (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Showing locations 1 - 50 of 775