Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(3)
26.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• One of three CHP in a horticultural environment
(2)
-
• One of three CHP in a horticultural environment.
13.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 2 more)
6 CHP engines horticultural environment with no auxiliiary load
(3)
13.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 2 more)
-
• 2MW gas CHP engine in a horticultural environment
-
• One 1.5 MW gas CHP engine in a horticultural environment
-
• One 2MW gas CHP engine in a horticultural environment
10.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• CHP at a horticultural environment.
-
• CHP at horticultural site
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
(3)
8.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(3)
8.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
(3)
6.4 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Two CHP gas engines in commercial horticultural environment with no auxilliary load
(3)
6.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP engine in a horticultural environment, natural gas, no aux load
(3)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP engine in horticultural environment with no auxilliary load
(3)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(3)
5.6 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
District heating implementation of two gas CHP engines with no auxilliary load
(3)
5.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
2 x gas fired CHP generators located at a horticultural site.
(3)
5.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(3)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
one CHP (1.9MW rating) in a horticulatural environment with no aux load
(3)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Two CHP engines in horticultural environment with no auxilliary load
(3)
4.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
(3)
4.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 2 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(2)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
One CHP, generating for site load which exceeds generating capacity. No aux load.
(2)
3.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
(3)
3.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(3)
3.5 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
One CHP engine in a horticultural environment with no auxilliary load.
(3)
3.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
(3)
2.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 2 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(3)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(3)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
District heating implementation with one asset 1MW and no auxiliary load
(3)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(3)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
2 x CHP at a horticultural site
(2)
2.3 MW
Active -
2028-29 (T-4),
2024-25 (T-4)
1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.
(3)
2.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(3)
2.1 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.
(2)
1.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
One 2MW gas CHP engine in a horticultural environment
(3)
1.8 MW
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(3)
1.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Front of the Meter battery storage asset located in Devon.
(3)
1.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Mixture of load reduction and standby generation.
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Load reduction
(3)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
-
• Load reduction on site supported by non-exporting standby generation.
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Load curtailment
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Standby generation
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)