Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

WHITETOWER ENERGY LIMITED

8 unique locations (23 components)

Active MW: 0.00 MW
Inactive MW: 41.91 MW
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Bristol Energy Bristol Energy +1 more BS34
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Viking Power Viking Power +1 more TS2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Factory Lane Croydon Surrey CR0 3LE (1 component)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Reciprocating engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Power CR0
Inactive • 2022-23 (T-4)
Factory Lane, Croydon, Surrey, CR0 3LE (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Energy Croydon Energy +1 more CR0
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Fort Parkway, Heartlands, Birmingham, B24 9QT (6 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Heartlands Power Heartlands Power +4 more B24
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power +1 more EX2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (2 components)

Existing OCGT. (2)

Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power EX2
Inactive • 2023-24 (T-1), 2022-23 (T-1)
Victory Road, Derby, Derbyshire, DE24 8BJ (2 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (2)

WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd DE24
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 8 locations