Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Waterswallows Energy Limited

15 unique locations (57 components) - Page 1 of 2

Wimbourne Bournemouth BH21 5EP (4 components)

Water treatment centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Staines Raw Water PS, Birch Green, , Staines, United Kingdom, TW18 4HA (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-1), 2023-24 (T-4)
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• Water source Heat Pumps at 1748KW each (2)
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-1), 2023-24 (T-4)
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-1), 2023-24 (T-4)
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-1), 2023-24 (T-4)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
• A standby diesel generator on a waste water treatment works. (2)
• A standby diesel generator on a waster water treatment works.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (6 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Francis Avenue Bournemouth BH11 8NX (4 components)

Water treatment centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations