Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

VEOLIA UK LIMITED

65 unique locations (269 components) - Page 4 of 7

New Haven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (2 components)

Energy from waste facility located in Newhaven East Sussex - . It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (8 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.58 MW
Newhaven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (1 component)

Steam turbine at energy from waste facility located in Newhaven East Sussex

Inactive • 2021-22 (T-4)
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (7 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Marchwood Industrial Park, Oceanic Way, Southampton, Hampshire, SO40 4BD (2 components)

Energy from waste facility located in Marchwood Hampshire - Postcode SO40 4BD. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.74 MW
Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB (2 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
2.46 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (2 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
7.10 MW
IWMF, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (3 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Iwmf, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (4 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations