Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Valencia Waste Management Limited

8 unique locations (33 components)

Active MW: 0.00 MW
Inactive MW: 115.37 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (2 components)

The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (2 components)

The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Exeter ERF, Grace Road South, Exeter EX2 8QE (14 components)
• Energy from Waste Facility located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4.5 MW subject to calorific value of waste and biogenic content
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (3 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (2 components)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Inactive • 2019-20 (T-1)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (6 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 8 locations