Utility I Ltd

5 unique locations (80 components)

Active MW: 37.94 MW
Inactive MW: 238.97 MW
CHERRY TREE WAY WITNEY OXFORDSHIRE OX28 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (29 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (3 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Whitwell, Worksop, Nottinghamshire, S80 3LJ (2 components)

LHOIST STEETLEY DOLOMITE

Active • 2025-26 (T-1), 2024-25 (T-1)
WR2 (36 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...