Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

UK Energy Reserve Limited

70 unique locations (171 components) - Page 7 of 7

Bristol Road Gloucester GL2 5YA (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Boundary Road, Sturmer, Haverhill CB9 7YH (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Boughton, Harrow Lane, Boughton, NG22 9ZB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Bicester Farm, Bicester OX25 2ND (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Bedfont Road, Feltham, Heathrow TW14 8EE (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Beddington Lane, Croydon, CR0 4TD (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Barnsley Retail Park, S71 1DL (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Aslockton, Moor Lane, Aslockton, Nottingham, NG13 9AH (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Alders Way, Paignton TQ4 7QL (1 component)

Construction of new small embedded power station site consisting of engines and ancillaries with new major plant items such as mains gas connection capacity (where appropriate), distribution grid connection capacity …

Inactive • 2020-21 (T-4)
Loading map...
Showing 10 locations