Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

TATA STEEL UK LIMITED

11 unique locations (191 components) - Page 1 of 2

Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (2 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD (130 components)

Manufacturing site providing demand response (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (5 components)

Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan) (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 component)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (6 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines ) (2)
• Site based CHP - note the primary fuel are Waste Gases
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (2 components)

Industrial process within the Tata Steel estate - specific installations TBC (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (17 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Carlton,Stockton-On-Tees,TS21 1EA (3 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 10 locations