Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE GENERATION LIMITED

9 unique locations (137 components)

Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (34 components)
• 1 x hydro turbine & synchronous generator
• Pre-refurbishment generating unit 1: single hydro turbine & synchronous generator
• Tummel unit 2 for 2017/18 delivery year only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.95 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (20 components)
• Peterhead 1
• Peterhead CCGT
• Peterhead CCGT for Delivery Year 2018/19 only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4315.48 MW
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (13 components)
• 1 x hydro turbine & synchronous generator (2)
• 1x hydro turbine & synchronous generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
47.41 MW
Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (4 components)

Wind Farm with 11 Wind turbines

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (11 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
130.93 MW
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (25 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
228.42 MW
Cluny Drive Newton Mearns Glasgow Lanarkshire G77 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Clunie Power Station, Pitlochry, PH16 5NF (13 components)
• Hydro Generating Gensets 1, 2 & 3 - Clunie
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
167.28 MW
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (8 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4) ...
111.88 MW
Loading map...
Showing 9 locations