Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

23 unique locations (447 components) - Page 2 of 3

Douglas Water Hydroelectric Generating Station, near Inveraray, Argyll, PA32 8XT (2 components)

Hydroelectric run of river power station

Active • 2028-29 (T-4)
5.46 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (12 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.91 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.04 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (9 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.38 MW
Inverbain Hydro, Shieldaig, Strathcarron, Ross-Shire IV54 8XH (2 components)

Hydroelectric plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.73 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (24 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
673.64 MW
ME2 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (61 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25658.00 MW
PL7 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Loading map...
Showing 10 locations