Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

41 unique locations (541 components) - Page 1 of 2

Active MW: 25167.39 MW
Inactive MW: 37546.32 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (46 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (10 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (2 components)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2025-26 (T-4), 2026-27 (T-4)
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2021-22 (T-4)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2017-18 (T-1), 2020-21 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2017-18 (T-1), 2020-21 (T-4)
RWE Cogen UK Ltd Moody Lane Grimsby DN31 2SW (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2020-21 (T-4)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (2 components)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (2 components)

Hydroelectric run of river generating plant

Active • 2028-29 (T-4)
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Markinch Power Station Glenrothes KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
Little Barford Power Station Little Barford St Neots PE19 6YT (29 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (8 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2018-19 (T-1), 2019-20 (T-1)
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4)
Inverbain Hydro, Shieldaig, Strathcarron, Ross-Shire IV54 8XH (2 components)

Hydroelectric plant

Active • 2028-29 (T-4)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (17 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2023-24 (T-1), 2023-24 (T-4) ...
Grimsby Power Station (formerly known as Grimsby CHP) Moody Lane Grimsby DN31 2SW (4 components)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations