Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Plutus Energy LTD

64 unique locations (515 components) - Page 5 of 7

Active MW: 18.91 MW
Inactive MW: 80.11 MW
HILLAM ROAD GATEFORTH SELBY YO8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HIGHFIELD CRESCENT BARLBY SELBY YO8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hales Lane Drax Selby YO8 8PL (1 component)

A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane

Active • 2025-26 (T-4)
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (2 components)
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 110 KW
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive • 2020-21 (T-4)
Gascoigne Wood Mine Lennerton lane Sherburn in Elmet Selby LS25 6LH (1 component)

Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW

Inactive • 2020-21 (T-4)
FOXGLOVE WAY HAMBLETON SELBY NORTH YORKSHIRE YO8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
FIELD LANE WISTOW SELBY YO8 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
FARRIER CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (47 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
DYON WAY BUBWITH SELBY YO8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 10 locations