Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PIVOTED POWER LLP

1 unique locations (1 components)

Active MW: 15.48 MW
Inactive MW: 0.00 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 3.5h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree CM77
Active β€’ 2025-26 (T-1)
Loading map...
Showing 1 locations