Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PIVOTED POWER LLP

14 unique locations (21 components)

Active MW: 117.42 MW
Inactive MW: 44.39 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Active • 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Active • 2024-25 (T-4)
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Indian Queens Pivot Power Indian Queens PL26
Active • 2026-27 (T-4), 2025-26 (T-1)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree Pivot Power Braintree +1 more CM77
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bredbury SK6
Active • 2025-26 (T-1)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bredbury Pivot Power Bredbury +1 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP Existing Generating CMU Pivot Power Sundon Pivot Power Sundon LU4
Active • 2025-26 (T-1), 2024-25 (T-1)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sundon Pivot Power Sundon LU4
Active • 2026-27 (T-4), 2025-26 (T-4)
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Norwich Not Prequalified NR14
Active • 2026-27 (T-4)
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Iver Not Prequalified UB8
Active • 2026-27 (T-4)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph Not Prequalified PL12
Active • 2026-27 (T-4)
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2026-27 (T-4)
Loading map...
Showing 14 locations