Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PIVOTED POWER LLP

1 unique locations (2 components)

Active MW: 12.48 MW
Inactive MW: 11.07 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP Existing Generating CMU Pivot Power Sundon Pivot Power Sundon LU4
Active β€’ 2025-26 (T-1), 2024-25 (T-1)
Loading map...
Showing 1 locations